A143 at Stanton gets temporary repairs as core samples to test surface

Suffolk Highways scheduled temporary repairs to the worst sections of the A143 at Stanton overnight on 31 October, while core samples will look at why the surface keeps deteriorating.

Road space was booked from 8pm on Saturday 31 October to 5am on Sunday 1 November, but crews expected to need a full closure for only a few hours of that window.
Signs reading “Road unsuitable for diversion traffic” were to go up on nearby local roads to keep through-traffic off unsuitable routes.
In brief:
- The repairs targeted the most severely affected sections of the carriageway.
- Timings and traffic management for the core sample testing will be published once it has been scheduled.
- Suffolk Highways says what the investigations find will shape a future programme of further works.
What happens next on the A143 at Stanton
In its statement, Suffolk Highways says the overnight work is intended to improve the condition of the road while longer-term investigations into the cause continue. Core samples will be taken from affected areas “to establish why the road surface continues to deteriorate and to identify the most effective long-term solution”. The statement recognises “the continued frustration and inconvenience” the surface issues are causing motorists, local residents and businesses.
The stretch has needed repairs before. In a July statement on the hot weather, the council said the A143 between Stanton and Ixworth had already been identified for improvement works because of existing defects, but prolonged heat and local traffic conditions accelerated its deterioration, forcing an emergency closure on safety grounds on 7 July.
The release doesn’t give what is causing the deterioration, who laid the current surface or what the repairs will cost. More on the county’s highways spending is in our September report on Suffolk’s roads budget.
Source: Suffolk County Council, published 30 October 2026
In this story Suffolk County Council



















