Dartford Crossing Set for Overnight Closure to Facilitate Essential Maintenance

National Highways has announced a full overnight closure of the Dartford Crossing’s Queen Elizabeth II (QEII) Bridge later this month, as part of ongoing maintenance works designed to preserve the structural integrity of this vital transport link.
The QEII Bridge, which spans the River Thames and connects Kent with Essex, will be entirely closed to traffic from 10pm on Friday, 26 April, until 5am on Saturday, 27 April. This temporary shutdown is necessary to allow maintenance teams to apply protective paint to exposed metal components, safeguarding the bridge from corrosion and ensuring long-term resilience.
In addition to this, the eastern tunnel at the Dartford Crossing will also undergo works, prompting a separate closure from 10pm on Saturday, 27 April, until 5am on Monday, 29 April. These closures form part of a wider, scheduled programme of routine maintenance carried out by National Highways.
A spokesperson for National Highways commented:
“We’ve had a series of closures at the crossing this month. Routine maintenance closures—such as the one this Saturday night—are undertaken on a six-weekly cycle.
The work includes sweeping, road deck checks, gully and drainage cleaning, lighting maintenance, and structural inspections. These efforts are critical to maintaining the safety and functionality of the bridge.”
Recognised as one of Europe’s busiest crossings, the Dartford Crossing plays a crucial role in the South East’s strategic road network. National Highways has urged motorists to plan their journeys in advance and allow extra travel time during the scheduled closures.
Contracts Watch
67 open highways tenders right now, plus who has just won what. Updated every hour.

















