DELTABLOC UK – Delivering Safety Solutions for Major Scheme on Lambeth Bridge


Lambeth Bridge, a historic and essential crossing in the heart of London, is undergoing critical improvement works, and DELTA BLOC UK is proud to be playing a key role in ensuring safety throughout the project.
Spanning 236 metres across the River Thames, Lambeth Bridge has been a vital part of the city’s infrastructure since its official opening on 19th July 1932.
With its distinctive five-span steel arch structure, the bridge remains a crucial route for both vehicles and pedestrians. As part of ongoing enhancements, essential waterproofing works and cycle lane improvements are being carried out to maintain and modernise this iconic structure.

To ensure maximum protection for both the workforce and the public during these works, DELTA BLOC UK has deployed its trusted SB 70 system. This solution, complete with tested fencing, provides the ideal balance between safety and efficient lane management – critical in such a high-profile urban environment.
Kevin Wrigglesworth, DELTABLOC UK MD commented:
“Lambeth Bridge is an integral part of London’s transport network, and it’s a privilege to contribute to its ongoing safety and functionality. Our SB 70 system has proven to be the perfect fit for this scheme, delivering robust protection while maintaining the smooth operation of the site.”

With heritage meeting innovation and safety aligning with efficiency, DELTA BLOC UK continues to play a pivotal role in shaping the future of London’s infrastructure.
The company extends its thanks to TKJV, Liam Wilding, and Ray Crawford for their collaboration and support throughout the project.
As work progresses, DELTA BLOC UK remains committed to delivering industry-leading safety solutions, ensuring that Lambeth Bridge continues to stand strong for generations to come.
Contracts Watch
67 open highways tenders right now, plus who has just won what. Updated every hour.





















