What a cylinder of tarmac tells Devon about its 13,000km of roads

The Devon materials laboratory tests asphalt cores, soils and winter salt behind the scenes, guiding repairs on England’s largest local road network. Its income makes the service cost-neutral to run.

A cylinder of tarmac drilled out of a Devon road can show engineers how well it was built, whether its layers are performing and where problems are developing.
Reading those cores is one job of the Devon materials laboratory, a small in-house team that four councillors toured this week.
In brief:
- The laboratory has operated since 1952 and has been based at Rockbeare Hill Quarry since 2014.
- It tests soil, asphalt, concrete and aggregates, measures skid resistance and foundation strength, and checks the salt and brine used by the winter fleet.
- The council says income from other councils, developers and businesses makes the facility cost-neutral to run.
What the Devon materials laboratory actually tests
Devon has the largest road network of any local highway authority in England: more than 13,000 kilometres of road, plus 4,834 bridges and thousands of other highway structures. On a network that size, choosing the wrong repair gets expensive quickly.
The laboratory was set up in 1952 to monitor the quality of asphalt being produced in the county, and quality is still at the heart of its work. Core samples from roads under construction are analysed for the type, depth, density and composition of the material laid by utilities and contractors. In plain terms, that checks whether what went into the ground matches what should have gone in. Samples from older roads help the council’s asset management team understand their condition and choose the right treatment. The council says this can stop money being spent on a repair that doesn’t address the underlying problem.
Other equipment measures skid resistance, which is the grip a road surface gives a tyre, and the strength of road foundations. Testing can also identify hazardous materials before maintenance begins. In winter, the team checks the salt and brine used by the council’s gritting fleet. Away from the carriageway, its specialists test soils and support bridge investigations, drainage design, slope stability work and surveys. Most of its testing is accredited by the United Kingdom Accreditation Service, and has been since 1989.
Councillors Neal Raleigh, Cheryl Cottle-Hunkin, James Buczkowski and Jacqueline Fry were shown round by laboratory manager Peter Dyer and materials engineer Graeme Peace. “This team works behind the scenes, but its expertise is built into roads and bridges across Devon,” said Cllr Raleigh. Cllr Cottle-Hunkin said having the knowledge in-house “means the advice is there from the earliest stage, not simply when something has gone wrong.”
The council says few authorities keep this breadth of testing and technical expertise. The laboratory mainly serves Devon County Council but also takes work from other local authorities, developers and private businesses. Customers can use one team for investigation, testing, analysis and technical reports, and the council says that income makes the facility cost-neutral to run.
The council also makes a waste and carbon case. If a longer-lasting material is chosen and the job is done right first time, fewer repeat repairs are needed. Devon has trialled repair methods before, with its county-wide pothole repair trial.
The release doesn’t give staff numbers, annual income or how many samples the laboratory tests each year. For drivers, none of this work is visible. What it decides is whether the next repair outside their door is the right one.
In this story Devon County Council

















