Highways winter readiness checklist as clocks go back on 25 October

The clocks go back on Sunday 25 October, and winter service is already under way. This covers what the law requires, what National Highways had ready last year, and a highways winter readiness checklist.

The clocks go back on Sunday 25 October, and for highways teams it’s a fixed date to check winter readiness. Commuting traffic moves into darkness, crews working on live carriageways lose daylight, and winter service is already under way.
In brief:
- Highway authorities in England and Wales have a duty under section 41(1A) of the Highways Act 1980 to ensure, so far as is reasonably practicable, that safe passage isn’t endangered by snow or ice
- National Highways says its winter service runs from 1 October to 30 April, and last winter its 530 gritters made 16,500 runs and spread more than 91,000 tonnes of salt
- A 2009 National Audit Office analysis found 10% more pedestrian collisions causing death or injury in the four weeks after the clocks went back
Highways winter readiness checklist for when the clocks go back
The section 41(1A) duty isn’t absolute, but it does require a reasoned, defensible approach. That approach is set out in Well-managed Highway Infrastructure: A Code of Practice, first published in 2016 and updated by the UK Roads Leadership Group and the Department for Transport on 14 October 2026, as we reported. The risk-based approach is retained.
It moved authorities away from prescriptive national standards towards a risk-based approach, under which each authority approves its own winter service policy and priorities. In practice that means defining a treated network based on risk, usually with priority routes such as main roads, bus routes and access to hospitals and emergency services, setting out decision-making procedures, response times and treatment methods, and documenting the reasoning so decisions can be explained and defended. Many authorities publish a winter service plan each autumn.
Effective winter service depends on forecasting and timely precautionary treatment. Authorities typically buy specialist road weather forecasts and use road weather stations to monitor surface temperatures so duty officers can decide whether to treat and ideally salt before ice forms. Salt resilience is the other half. Authorities set their own minimum stock levels, usually expressed as days of resilience at a given treatment intensity, so the treated network can stay open through a prolonged cold spell without relying on emergency deliveries. In a national shortage, central government can intervene in how salt is allocated, so local stocks remain the first line of defence.
On the strategic road network, National Highways said last year it had readied 530 gritters, more than 120 salt depots and more than 250,000 tonnes of salt for the 2025/26 winter. Its gritters covered more than a million miles last winter, as we reported in April.
Darker evenings change the risk profile. The National Audit Office’s 2009 analysis of 2000 to 2007 data found about 10% more collisions killing or injuring a pedestrian in the four weeks after the clocks went back than in the four weeks before, as RoSPA reports. Authorities can check that street lighting faults are cleared quickly, that signs and road markings are clean and legible, and that vegetation isn’t covering signs or sightlines going into winter.
The same darkness affects people working on the highway. Contractors and authorities should review high-visibility clothing, vehicle conspicuity, temporary traffic management layouts so signs, cones and lamps are visible in darkness and rain, and work planning so the riskiest tasks use the best available light. Fatigue is also worth checking for winter service operatives, whose shifts are often unpredictable and at night.
Here is our highways winter readiness checklist for highway authorities, contractors and winter service teams to work through before the clocks change on Sunday 25 October. It’s based on the approach in the code and typical authority winter plans but isn’t an official or statutory list.
Winter readiness checklist: before the clocks change:
- Confirm the winter service plan is formally approved and published, in line with the code
- Check salt stocks against the agreed resilience level, and confirm resupply arrangements
- Service, calibrate and test the gritter fleet on routes, and check forecasting contracts and road weather stations
- Review treated routes for new roads, developments and changes to bus or school routes
- Run a dry run of decision-making and call-out procedures, and check operatives’ training and route familiarisation
- Review street lighting and sign and marking defects on priority routes
- Brief site teams on low-light working and high-visibility requirements
- Tell the public which roads are treated and how to use grit bins
A winter plan is only as good as its preparation, and checking it when the clocks change gives authorities time to fix gaps before the first hard frost.
In this story National Highways


















