Lancashire transport plan sets out £643m of priorities to 2030

Lancashire has approved a £643.1m transport plan covering the next four years, with 20 priorities spanning bus services, active travel, rail and electric vehicle infrastructure.

Lancashire has set out how it plans to use £643.1m of devolved transport funding between 2026/27 and 2029/30.
The Lancashire Combined County Authority has approved its first Local Transport Delivery Plan, setting out 20 priorities for investment across the county.
In brief:
- Lancashire’s Local Transport Delivery Plan covers 2026/27 to 2029/30.
- The Lancashire Combined County Authority has approved 20 transport priorities.
- The plan covers bus services, active travel, rail and electric vehicle infrastructure.
- The funding package comprises £571.5m of capital funding and £71.6m of revenue funding.
What Lancashire’s £643m transport plan means for highways
The headline figure is substantial, but the detail is more useful than the number itself.
The Lancashire Combined County Authority has approved its first Local Transport Delivery Plan, setting out how £643.1m of devolved transport funding will be invested between 2026/27 and 2029/30. The plan covers a range of transport priorities rather than being a dedicated highways programme.
The 20 priorities include improvements to bus services, active travel infrastructure, rail and electric vehicle infrastructure. The funding is largely allocated to wider project areas rather than individual schemes, with the £28.2m allocation for the proposed Cottam Parkway railway station identified separately.
For highways professionals, that distinction matters. The £643.1m should not be read as £643m of individual road schemes waiting to go to site. It is a wider transport funding package covering several different parts of the network.
The funding itself is split between capital and revenue. Lancashire is due to receive £571.5m in capital funding between 2026/27 and 2029/30, alongside £71.6m in revenue funding through to 2028/29.
That gives the authority a broad programme to work with, covering both physical infrastructure and transport services. It also means the impact will not arrive in one form or at one speed. A new piece of infrastructure is a very different proposition from a bus service improvement or work intended to make an existing transport facility more accessible.
The plan follows the development of Lancashire’s wider Local Transport Plan, which sets out the authority’s longer-term transport strategy. That strategy includes priorities around public transport, east-west connectivity, rural access, safer streets and the use of technology across the transport network.
There is a clear highways interest in that wider approach. Lancashire’s transport network does not operate as a collection of completely separate modes. Changes to bus provision, active travel routes or rail infrastructure can all affect how people use roads, even where no new carriageway is being built.
That does not mean every priority will translate into roadworks. It means the county’s transport investment is being planned across the network rather than around highways alone.
The practical impact of transport investment can also extend beyond the individual scheme being funded. A change to one part of a network can alter traffic movements elsewhere, just as we have seen with Weston-super-Mare road resurfacing sparking fresh rat-run concerns, where changes to the condition of a residential road became part of a wider discussion about how the route was being used.
The delivery timetable is also worth watching. The current plan covers four financial years, from 2026/27 through to 2029/30, while the separate Local Transport Plan Implementation Plan explains how transport improvements are intended to be delivered locally over the same period.
For contractors, consultants and highway authorities, that is where the announcement becomes more practical. A funding allocation is the starting point for delivery rather than the finished product. Projects still have to move through design, approvals, procurement and construction before drivers or passengers see the result.
The Lancashire announcement therefore matters less because it contains 20 items on a list and more because it establishes the framework for how a sizeable transport budget will be used over the next four years.
For road users, the eventual changes could range from improvements to the road network and transport infrastructure to better bus services, active travel facilities and railway stations. The precise effect will depend on how the individual priorities are developed and delivered.
That makes the next stage more important than the headline figure. Lancashire now has a four-year delivery framework and a defined set of transport priorities. The test will be how much of that plan turns into physical improvements and better day-to-day journeys across the county.
Stay sharp
Never miss a story
The daily highways digest, straight to your mailbox.
You will get a confirmation email. Unsubscribe anytime. About The Highways Industry Newsletter →




























