8 low-carbon road materials ranked by evidence, from proven to trial

A plain guide to low-carbon road materials in the UK, from warm mix asphalt to bio-binders and cold recycling, sorted by the evidence behind each carbon claim and whether specifications allow it.

Materials are the biggest source of carbon when National Highways builds and maintains roads, and the savings claimed for greener alternatives range from 1% to more than 60%. National Highways estimates that every tonne of asphalt it lays emits an average of 70 kg CO2e, and every tonne of concrete 88 kg. This guide sorts low-carbon road materials by evidence.
In brief:
- Warm mix asphalt and recycled asphalt are already written into the Specification for Highway Works, and National Highways has asked for warm mix as standard since 2021.
- Bio-binders cut carbon by 1% to 5 per cent per square metre on a Live Labs 2 test road, against the 26% one manufacturer reports from National Highways trials.
- Cold in-situ recycling showed the largest measured cuts, about 59 to 63 per cent against conventional reconstruction, though one result is still provisional.
Last updated: 22 October 2026
Which low-carbon road materials are proven?
Warm mix asphalt, recycled asphalt and cold recycling have measured carbon figures and a place in the specification. Bio-binders, biochar, plastic additives and new cement blends are low-carbon road materials still at trial stage and not yet in standards.
National Highways’ net zero roadmap for concrete, steel and asphalt, published in 2022, commits it to cutting construction and maintenance emissions by at least 90 per cent against 2020 by 2040, a central theme of our sustainability coverage. It models a 78% cut in the carbon intensity of asphalt by 2040.
Savings for low-carbon road materials are as each source claims them, so they are not directly comparable.
| Material | Claimed carbon saving (source, basis) | Evidence level | Where used |
|---|---|---|---|
| Warm mix asphalt | Up to 15% (National Highways, formerly Highways England, 2021). 9% per m2, A1 to A5 (Live Labs 2 trial) | Specified as standard: SHW clause 908 since July 2021 | Strategic road network since 2015; council trials |
| Reclaimed asphalt (RAP) | No single figure published by National Highways | Specified as standard: SHW clause 902 | Strategic road network; 50% surface course trial reported by TfL on the A1 |
| Bio-binders | Around 26% for the asphalt (Heidelberg Materials, CarbonLock). 1% to 5% per m2, A1 to A5 (Live Labs 2 trial) | Trial; not yet in the specification | A30, A2, A34; Hirst Road, North Lanarkshire |
| Biochar and carbonated aggregate | 45% (GreenPrint biochar); 43% to 58% (ACLA). A1 to A5, on supplier or academic data | Small trial | One street and two car parks, North Lanarkshire |
| Recycled plastic additives | Not assessed (Cumbria report, 2021). 4% per m2 for GiPave (Live Labs 2 trial) | Trial | Cumbria; Hirst Road, North Lanarkshire |
| Crumb rubber from tyres | Up to 10% less CO2 (City of Wolverhampton Council, 2020) | Trial | Northycote Lane, Wolverhampton |
| Cold recycling | 63% (Colas, provisional) and 59% (Stabilised Pavements), A1 to A5 (Live Labs 2). 50% (Oxfordshire County Council) | Specified: SHW clauses 947 and 948 | Oxfordshire; North Lanarkshire |
| Low-carbon cement and concrete | Up to 80% against CEM I concrete for an alkali-activated mix (Tarmac) | Blended cements in BS 8500; alkali-activated mixes at trial stage | M42 junction 6 haul road trial |
Percentages in this table are rounded to whole numbers.
Is warm mix asphalt now standard?
On the strategic road network, yes. Warm mix is made up to 40°C cooler than hot mix. In August 2021 National Highways (formerly Highways England) said warm mixes offer CO2 savings of up to 15%, dropped the need for a departure from standard and asked designers and contractors to use them as standard.
Clause 908 of the Specification for Highway Works, added in July 2021, requires a cradle-to-gate carbon footprint for each warm mixture. The roadmap targets at least 50% warm mix on the strategic road network by 2025 and 80% by 2030. We could not find a published figure showing whether the 2025 target was met. National Highways’ Low Carbon Demonstrator Fund delivered 11 schemes in 2025-26, saving about 4,400 tonnes of CO₂e over their whole life.
On the Live Labs 2 supersite on Hirst Road in North Lanarkshire, a warm mix surface course laid by Holcim produced 8.39 kgCO2e per square metre, against 9.19 for the hot rolled asphalt beside it: a 9% cut across extraction to construction, the life cycle stages known as A1 to A5. But warm mix still uses bitumen, which the roadmap expects to be the biggest remaining source of carbon in asphalt in 2040.
How much recycled asphalt can go into a road?
Reclaimed asphalt, the material planed off old roads, is already allowed in every layer under clause 902 of the Specification for Highway Works, with extra binder testing above 10 per cent and stiffness testing above 25% in designed base and binder courses.
The roadmap targets an average of 15% in thin surface courses by 2025 and 35% by 2035 and 35% in asphalt concrete by 2025, rising to 55% by 2035. Transport for London (TfL) has reported a long-term trial of 50% reclaimed asphalt in the surface course on the A1 at Mill Hill, which we covered in 2025.
Do bio-binders and biochar cut carbon?
Bio-binders replace part of the bitumen with material derived from plant oils or residues. The roadmap targets a 50% cut in the embodied carbon of bitumen by 2040, with bio-binders as one route.
Several National Highways trials have used Heidelberg Materials’ CarbonLock asphalt. After an A30 trial in Devon in 2023, sections were laid on the A2 in Kent and the A34 in Berkshire with up to 30% reclaimed asphalt. Heidelberg Materials, which makes it, says the trials cut the asphalt’s carbon by around 26%. In its case study, Umesh Parajuli, a senior pavements adviser at National Highways, said he hoped the trials would bring bio-binder solutions “into our specification”.
The Live Labs 2 results are smaller. Styrelf Bio-PMB X70 produced 8.74 kgCO2e per square metre against 9.19 for the control, a 5% cut. Tarmac’s UltiPave Bio binder, in hot-rolled asphalt with 26% reclaimed material, produced 9.06, a 1% cut. The Styrelf evaluators said they could not comment on the permanence and accounting of biogenic carbon, as no detailed method was supplied to back the carbon-sink claim.
Biochar shows bigger numbers on thinner evidence. Biochar made from verge grass cuttings collected by South Gloucestershire and West Sussex councils made up 1 per cent of a binder course in Bellshill and was assessed at about a 45 per cent cut. ACLA, a biochar-based aggregate from low-carbon materials, was assessed at about 43% and 58% cuts in two Coatbridge car parks. Both evaluations say the appraisal was built on supplier-provided or academic material, not data from the trial. Colas combined biochar, a bio-binder and reclaimed asphalt on Corkscrew Lane in Cheshire.
What about plastic and rubber in roads?
The fullest UK study is from Cumbria, where the county council and MacRebur trialled waste plastic additives with ADEPT Live Labs funding from 2019. WSP’s final report, dated November 2021, found the plastic mixes broadly comparable with the controls but stiffer, with a wider spread of results that raised quality control concerns. A full life cycle assessment could not be done for lack of supply chain data, and the report recommended testing for microplastic release.
On Hirst Road, GiPave, a graphene additive containing recycled plastics, came out 4% lower than the control; about a 55% figure in the same report assumes the surface lasts five years longer.
For rubber, the City of Wolverhampton Council said in March 2020 that Northycote Lane had been resurfaced with Tarmac using about 500 recycled tyres, laid at a lower temperature with up to 10% less carbon dioxide. We found no published long-term data or independent carbon assessment for UK rubber trials.
Is in-situ recycling worth it?
Cold in-situ recycling breaks up the existing road and binds it with foamed bitumen or emulsion to form a new base. Clauses 947 and 948 of the Specification for Highway Works cover the in situ process and the ex situ version, made from planings processed off site. Transport Scotland has a protocol for recycling roads containing old tar, which is hazardous waste.
Two Live Labs 2 trials on Hirst Road gave the largest measured savings. Colas’s Regen process came out about 63% lower than conventional reconstruction, a result treated as provisional until the University of Nottingham verifies the emulsion’s emission factor. Stabilised Pavements’ sections came out about 59% lower overall. Its section bound with CEM II cement produced more than four times the carbon of its HEVA Sol section, so the binder matters.
Oxfordshire County Council said cold recycled material made from stockpiled planings laid on five roads in 2023 with Milestone Infrastructure (now M Group Highways) saved 50% of embodied carbon. The Colas evaluators want more research on whether recycled layers can be recycled again. On the A47 between Acle and Great Yarmouth, National Highways laid a new structural layer made from more than 90 per cent recycled materials using cold recycled bound material.
What about low-carbon concrete and cement?
National Highways says cement and concrete produce more of its emissions than asphalt or steel. Its roadmap models a 48% cut in concrete’s carbon intensity by 2040 and says the priority before 2030 is coping with less ground-granulated blast-furnace slag (GGBS), a common cement replacement, by using limestone and ternary cement blends.
BS 8500 was revised in November 2023 to add two lower-carbon ternary cements, CEM II/C-M and CEM VI, according to The Concrete Centre.
On the M42 junction 6 scheme, Skanska laid test slabs on a temporary haul road in December 2021 using Tarmac’s alkali-activated cementitious material in place of cement, some reinforced with basalt fibre instead of steel. Tarmac said the concrete’s footprint was up to 80% lower than a standard CEM I concrete.
Why do carbon claims for low-carbon road materials differ so much?
Some claims cover only the product stages, A1 to A3; the Live Labs 2 reports run to A5, including transport and laying. The baseline matters too: the Hirst Road control contained 15% reclaimed asphalt, and when both were modelled at zero, the warm mix saving rose from 9% to 20%.
Durability also matters. Two grouted macadams from Miles Macadam had higher upfront carbon than the Hirst Road control. They come out lower only if they last longer, and the HardiPave evaluators asked for at least five years of monitoring to test that.
Buyers of low-carbon road materials should ask which stages a figure covers, what it is compared with, and who checked it. Suppliers are listed in our construction materials directory. Live Labs 2 has published The Little Book of Live Labs 2, which has published a practical guide for councils, is due to send its final report to the Department for Transport in spring 2027.
Sources: National Highways net zero roadmap for concrete, steel and asphalt, published 2022, National Highways Net Zero Highways Annual progress report 2025-26 with ADEPT Live Labs 2 evaluation reports (April and August 2026) and releases as named – available on request.
In this story National Highways, Tarmac, Colas Ltd (formerly Eurovia UK), Heidelberg Materials UK (formerly Hanson Contracting), Oxfordshire County Council, City of Wolverhampton Council