National Highways regions and the 10 contracts that maintain them

National Highways runs England’s motorways and major A roads through six regions and numbered areas. This guide to the National Highways regions covers what it runs, who maintains each area, its funding and contacts.

National Highways is the highway authority for England’s motorways and major A roads, the routes that carry a third of all traffic. It does not look after your local high street, the roads run by Transport for London or anything in Scotland, Wales or Northern Ireland. This guide sets out what it does run, how the National Highways regions and numbered areas fit together, where its money comes from and how to reach it.
In brief:
- National Highways is the government-owned highway authority for England’s strategic road network: more than 4,500 miles of motorways and major A roads.
- It works through six National Highways regions and a set of numbered maintenance areas, each covered by a maintenance and response contract.
- The third Road Investment Strategy (RIS3) provides over £27bn from April 2026 to March 2031, and the Office of Rail and Road monitors delivery.
Last updated: 27 October 2026
Which roads does National Highways run, and which does it not?
National Highways describes itself as the government company that plans, designs, builds, operates and maintains England’s motorways and major A roads. Together these make up the strategic road network, or SRN. The company says the network covers more than 4,500 miles and is the most heavily used part of the national road network, carrying a third of all traffic and two-thirds of all freight.
Its legal footing is the Infrastructure Act 2015. Section 1 lets the Secretary of State appoint a company, limited by shares and wholly owned by the Secretary of State, as a highway authority. Such a company is called a strategic highways company. The Appointment of a Strategic Highways Company Order 2015 gave that role to Highways England Company Limited from 1 April 2015, covering the roads in England for which the Transport Secretary had been responsible. The order excludes the M6 Toll and short stretches of the M4 and M48 near the Welsh border. GOV.UK lists the company as an executive non-departmental public body sponsored by the Department for Transport.
The name changed in August 2021. The explanatory memorandum to the 2023 regulations that updated the legislation says Highways England Company Limited became National Highways Limited, remaining the same legal entity. It adds that the new name helps distinguish the strategic network from local roads, which are the responsibility of local authorities.
That distinction is the first thing to check before reporting a problem. National Highways says local roads are managed by the relevant local authority and London roads by Transport for London. If the road is not a motorway or one of its major A roads, the council is usually the right place to start.
Who runs motorways in Scotland, Wales and Northern Ireland?
National Highways covers England only. The 2015 order appoints it for an area consisting of the whole of England, and each of the other nations has its own arrangement.
- Scotland: Transport Scotland oversees the trunk road network and says it maintains, upgrades and monitors it, including bridges, structures and landslide measures.
- Wales: two trunk road agents, the North and Mid Wales Trunk Road Agent and the South Wales Trunk Road Agent, manage, maintain and improve the Welsh Government’s strategic road network. Traffic Wales, the bilingual traffic information service for motorways and trunk roads in Wales, says the agents cover 1,510 kilometres of trunk road, including 178 kilometres of motorway.
- Northern Ireland: DfI Roads, part of the Department for Infrastructure, is the sole road authority, covering motorways and trunk roads as well as local roads, and works through four divisions.
What are the National Highways regions and areas?
The Office of Rail and Road (ORR), which compares performance across the country, describes six National Highways regions: South West, South East, East, Midlands, North West, and Yorkshire and the North East. Below the National Highways regions sit numbered areas, and those numbers still appear in contract names.
Each area has a maintenance and response contract. Notices published on Find a Tender on 12 August 2025, which vary the existing contracts, say they cover cyclical and reactive maintenance, incident response, defect repairs and severe weather work on the area’s motorways and trunk roads, plus roadside technology maintenance and traffic management.
| Region | Area | Counties covered | Contractor |
|---|---|---|---|
| South West | Areas 1 and 2 | Somerset, North Somerset, South Gloucestershire, Bath and North East Somerset, Gloucestershire, Devon, Cornwall, Wiltshire, western Dorset, Plymouth and Bristol | Ringway Infrastructure Services |
| South East | Area 3 | Hampshire, Surrey, Berkshire, Oxfordshire, part of Dorset and part of Buckinghamshire | Kier Highways |
| South East | Area 4 | Kent, Surrey, West Sussex and East Sussex | Kier Highways |
| East | Areas 6 and 8 | Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk and Suffolk | Ringway Infrastructure Services |
| Midlands | Area 7 (East Midlands) | Leicestershire, Northamptonshire, Derbyshire, Nottinghamshire, Lincolnshire, Rutland and parts of Warwickshire and Oxfordshire | Amey Highways |
| Midlands | Area 9 (West Midlands) | Herefordshire, Shropshire, Staffordshire, Warwickshire, West Midlands and Worcestershire | Colas |
| North West | Area 10 | Cheshire, Greater Manchester, Merseyside and Lancashire | Amey OW |
| North West | Area 13 | Cumbria and Lancashire | Kier Highways |
| Yorkshire and North East | Area 12 | Yorkshire and the Humber | Amey OW |
| Yorkshire and North East | Area 14 | Northumberland, Tyne and Wear, County Durham and North Yorkshire | CH2M HILL United Kingdom and Costain |
National Highways regions as named by ORR; counties as listed in each Find a Tender notice of 12 August 2025. Areas 1 and 2, and 6 and 8, share a single contract.
Some routes have been run under separate design, build, finance and operate (DBFO) contracts. The August 2025 notices fold several of them into the area contracts as those deals expire, including sections of the A417/A419, the A30/A35, the M40, the A50, the A69, the A19, the A1(M) between Alconbury and Peterborough, and the M1-A1 link between Lofthouse and Bramham.
The National Highways regions and area lines are easier to follow on a map. See the full National Highways area map and contacts in the Highways Industry directory, which colours every motorway and A road by area and lists the scheme design and pavement suppliers for each.
How is National Highways funded and held to account?
Money comes through a Road Investment Strategy. Section 3 of the Infrastructure Act 2015 requires each strategy to set out the objectives the company must achieve over its period and the financial resources the Transport Secretary will provide to achieve them.
The first strategy covered 2015 to 2020 and the second 2020 to 2025. A one-year interim settlement of £4.842bn covered April 2025 to March 2026. The third Road Investment Strategy, published by the Department for Transport on 26 March 2026, runs from April 2026 to March 2031. The government says it provides over £27bn, including:
- £24.99bn to operate, maintain, renew and enhance the network
- £8.4bn for renewals, targeting major structures and replacement of road surfaces
- £3.8bn for enhancement schemes
- a further £1.65bn for the publicly funded works on the Lower Thames Crossing
Oversight sits with ORR. Section 10 of the Act requires it to monitor how a strategic highways company exercises its functions, and allows it to investigate and report on whether, how and at what cost the company has met its strategy objectives. ORR says it monitors and enforces the performance and efficiency of National Highways in England and publishes an annual assessment. RIS3 also names Transport Focus as independent watchdog.
How does National Highways buy its work?
National Highways buys maintenance, renewals and construction work from suppliers through long-term contracts and frameworks. The main published routes are:
- Maintenance and response contracts: one per area, as in the table above. The successor, Maintenance and Response 2 (M&R2), went out to tender on Find a Tender on 24 August 2026 under the competitive flexible procedure. The earlier planning notice describes seven location-based lots, an estimated £7.96bn, running from 6 January 2028 to 1 July 2037. We covered the procurement in our report on the £8bn M&R2 deal.
- Scheme Delivery Framework (SDF): announced on 16 September 2021, a six-year framework for up to £3.6bn of renewals work with 50 suppliers, split into bands for civil engineering and drainage, temporary traffic management and road restraint systems, specialist works, and design.
- Scheme Delivery Framework 2 (SDF2): a tender notice published on 29 September 2025 puts it at an estimated £14.5bn over eight years, with lots for pavements, traffic management, structures, road markings, signs and lighting, design and more. The notice says it builds on the SDF and the Pavement Delivery Framework.
- Regional Delivery Partnership: announced on 7 November 2018 for up to £8.7bn of work from 2019 through to 2024, split into eight lots and 18 packages and shared between 13 delivery integration partners.
New National Highways tenders, frameworks and awards are tracked as they appear on Highways Industry Contracts Watch.
Which major schemes is National Highways building?
Among the schemes under way is the Lower Thames Crossing, a new road connecting Kent and Essex through a tunnel beneath the River Thames. National Highways says work began in early 2026. It also reports that the Highways (Financing) Bill, introduced to Parliament on 10 September 2026, would enable private investment in the construction of major road projects such as the crossing.
In the North, RIS3 funds the A66 Northern Trans-Pennine scheme, which National Highways says has planning permission to dual 18 miles of single carriageway between Penrith and Scotch Corner. Not every scheme survives: the government cancelled the A12 Chelmsford to A120 widening after the Spending Review, according to a National Highways update dated 1 August 2025, even though development consent had been granted in January 2024.
National Highways keeps a list of current projects, with updates for each, on its road projects pages.
How do you report a problem to National Highways?
Litter and other maintenance problems on motorways and major A roads can be reported through the company’s online reporting service. Its customer contact centre is on 0300 123 5000, and it says advisers are available any time, day or night.
For a motorway or trunk road in Scotland or Wales, contact Transport Scotland or Traffic Wales; in Northern Ireland, DfI Roads. For local roads in England, contact the council. Contact details, regional office addresses and the area map are on our National Highways directory page.
Source: Department for Transport, Road Investment Strategy 3 (RIS3): 2026 to 2031, published 26 March 2026, and the primary sources linked in each section, checked on 27 October 2026.