Nottinghamshire surfacing schemes hit 250 this year, 450 planned

Nottinghamshire surfacing schemes delivered in the first half of 2026/27 already outnumber the whole of last year’s, the county council says, with Haywood Oaks Lane in Blidworth marking the milestone.

Haywood Oaks Lane is the 250th of more than 450 schemes planned for 2026/27, and crews there are recycling the old road in place. The cold recycling process breaks down the existing carriageway, mixes it with a binding material, then grades and compacts it into a strengthened foundation before a new surface is laid.
In brief:
- The council is working with its highways partner Via East Midlands and says it is matching the right treatment to the right road.
- Reusing material already in the road reduces the need for new aggregates and asphalt and cuts waste, carbon emissions and lorry movements, the council says.
- Resurfacing runs alongside pothole repairs, surface dressing, micro asphalt and preventative maintenance, plus spending on footways, drainage, bridges, street lighting and traffic signals.
How Nottinghamshire surfacing schemes fit the six-point plan
Haywood Oaks Lane had deteriorated beyond the point where preventative maintenance alone would be enough, the council says. The programme supports its six-point plan, published earlier this year: preventing problems before they develop, making permanent repairs wherever possible, using high-quality materials and methods, improving efficiency, strengthening winter resilience and pressing for more long-term funding.
Councillor Bert Bingham, Cabinet Member for Transport and Environment, said: “We need every pound to work as hard as possible. That means choosing the right treatment for the right road and using proven techniques that deliver lasting value.” He added: “There is still a huge amount of work involved in bringing our roads up to the standard residents rightly expect, but we are making significant progress.”
The money behind the programme was set out in April, when the council announced a second phase of its highways capital programme that took its investment for the next 12 months to £181.25m, as we reported at the time. That followed a £122.5m first phase announced less than a month earlier, and council leader Mick Barton said the package used the council’s own reserves and funding from the East Midlands Combined County Authority (EMCCA).
The release doesn’t give the cost of the Blidworth scheme or say how many of the planned schemes will use cold recycling.
Source: Nottinghamshire County Council, published 27 October 2026
In this story Nottinghamshire County Council, Via East Midlands


















