SHIMPAC®: The Speedy Solution to Avoid Roadwork Fines


With new government penalties now in place for utility companies delaying roadworks, speed has never been more critical.
Slow or overrun projects could see contractors hit with fines of up to £10,000 per day, adding immense pressure to complete works efficiently. This is where SHIMPAC® provides a vital solution – its unrivalled installation speed is a game-changer, helping contractors avoid delays, reduce disruption, and keep costs under control.
Speed: The Ultimate Weapon Against Fines
Traditional ironwork seating solutions often rely on mortar-based methods, requiring a number of days for full curing. These lengthy installation times not only slow projects down but also increase the risk of costly overruns. SHIMPAC®, however, completely transforms the process.
“Over the years we have engineered and developed SHIMPAC® Systems products to deliver a number of major benefits to Highways Authorities, Contractors and Road users alike.”

“Speed is one of those key benefits, with our products enabling one-day road closures, SHIMPAC®’s 10-15 minute installation time means more ironwork seating can be installed and/or maintained,” explains Peter Rieck, SHIMPAC® Systems [CEO, MD, Company Owner – which has better impact?].
“Our speed benefits have always been of benefit to a contractor, local authority and road user, as roads are back in full use quicker, reducing disruption. SHIMPAC® is [probably] the fastest, cost-effective, engineering solution.”
“Now, there’s an even greater benefit to contractors utilising our system – avoiding the government’s recently announced financial penalties for roadworks overrunning.”
FIND OUT MORE: Government Crackdown on Utility Companies to Speed Up Road Repairs
With SHIMPAC®, ironwork installations can be safely trafficked within just 40 minutes, meaning lane closures are drastically reduced, road user disruption is minimised, and projects are completed well within timeframes – keeping contractors and local authorities clear of financial penalties.
Reducing the Risk of Lane Rental Charges
With new regulations holding utility companies accountable for roadwork delays, lane rental schemes are becoming an increasing financial burden.
The faster a contractor can get a road reopened, the lower the overall costs. SHIMPAC®’s rapid installation process ensures that:
- Lanes are reopened significantly faster than traditional methods.
- Correctly installed SHIMPAC® systems allow traffic to return in just 40 minutes.
- Worksites are cleared more efficiently, minimising congestion and public complaints.
Cost Efficiency Through Speed and Simplicity
SHIMPAC®’s speed not only prevents fines but also delivers huge cost savings across the board.
SHIMPAC® System’s extensive range of products are designed to match all available commercial ironwork, are engineered for safety doing away with cutting equipment and avoid the necessity for heavy lifting machinery, making installations a one-man operation. Not only do they reduce labour costs and mortar curing times are cut significantly – just 15 minutes for fast-set mortar, rather than days – but they also cut road closure times further reducing risk to employees and alleviating road user frustration.
VISIT SHIMPAC®
The SHIMPAC® system also eliminates the need for repeat site visits, reducing vehicle movements and resource costs. This, alongside showing as much as or more than 60% total cost savings over alternative ironwork seating solutions.
By removing unnecessary delays, SHIMPAC® ensures projects remain within budget while meeting the new compliance standards that demand efficiency.

Durability: Eliminating the Need for Costly Reworks
A fast installation is only part of the equation – SHIMPAC® is also engineered to last.
Unlike traditional systems that can fail under extreme traffic loads, SHIMPAC® is designed to withstand even the most extreme pressures [tested independently to F900 Class ironwork standards and beyond]. Installed correctly SHIMPAC® Systems ROADSHMS® take the increasing pressures of 48-tonne HGVs in their stride, keeping roads intact for decades rather than years. This durability eliminates the need for expensive reworks or emergency repairs, and allowing the contractor to increase their productivity handling more installations quicker, further supporting compliance with government efficiency targets.
Precision Engineering: The Key to Long-Term Performance
SHIMPAC®’s ROADSHIMS® enable mm precision, ensuring ironwork is perfectly level with the road surface. This prevents failures caused by movement, eliminates water ingress, and significantly extends the lifespan of installations.
With SHIMPAC®, road surfaces remain smooth, potholes are prevented, and contractors avoid repeat fines for substandard work.
Avoiding Fines: The Smartest Choice for Utility and Roadwork Contractors
With the government enforcing stricter rules on roadwork delays, choosing SHIMPAC® isn’t just an efficiency decision – it’s one of financial necessity. Contractors using SHIMPAC® benefit from:
- Faster installations – 10-15 minutes per unit
- Roads reopened within 40 minutes
- Fewer lane rental fees and overrun fines
- Drastically reduced labour and resource costs
- A durable system that eliminates the need for repeat repairs
For utility companies and contractors facing increasing scrutiny and financial penalties, SHIMPAC® offers the fastest, most cost-effective solution. With unmatched speed, precision, and durability, it’s the smart choice for those who want to stay ahead of the game.
MORE FROM SHIMPAC® ON HIGHWAYSINDUSTRY.COM HERE
Stay sharp
Never miss a story
The daily highways digest, straight to your mailbox.
You will get a confirmation email. Unsubscribe anytime. About The Highways Industry Newsletter →


























